Laporan Keuangan Pembangunan Masjid An-Nubuwwah per 15 November 2015, sebagai berikut :
PENERIMAAN MAL INFAQ
NO |
KETERANGAN |
TOTAL (Rp) |
1 |
LAMPUNG |
978.104.817 |
2 |
JABODETABEK |
274.044.000 |
3 |
JAWA BARAT |
309.650.500 |
4 |
JAWA TENGAH UTARA |
140.000.000 |
5 |
JAWA TENGAH SELATAN |
339.755.000 |
6 |
SUMATERA SELATAN |
49.304.500 |
7 |
SUMATERA UTARA & NAD |
500.000 |
8 |
JAMBI |
82.825.000 |
9 |
KALIMANTAN BARAT |
155.250.000 |
10 |
KALIMANTAN TIMUR |
109.100.000 |
11 |
INDONESIA TIMUR |
9.951.000 |
12 |
MALAYSIA |
99.792.925 |
13 |
Markaz I CILEUNGSI |
98.316.575 |
14 |
THAILAND |
5.325.000 |
15 |
Donatur Dari ketua MPR |
37.618.000 |
16 |
Donatur Dari Kantor Kecamatan Natar |
14.248.300 |
17 |
Pendengar Rasil AM 720 |
186.500.000 |
18 |
Hamba Allah (setor tunai) |
288.396.782 |
19 |
Hamba Allah (transfer Bank) s/d 15 Nov 2015 |
1.436.576.000 |
|
TOTAL PEMASUKAN |
4.665.258.399 |
PENGGUNAAN MAL
NO |
PENGELUARAN |
JUMLAH (Rp) |
1 |
Pembelanjaan Material |
3.079.179.969 |
2 |
Transportasi |
131.643.200 |
3 |
Jasa |
26.848.200 |
4 |
Upah Kerja Tukang |
406.040.000 |
5 |
Bisaroh Staff Kantor |
164.199.150 |
6 |
Konsumsi |
78.069.700 |
7 |
Akomodasi |
25.207.450 |
8 |
Percetakan |
11.095.000 |
9 |
Listrik, Air, Telephone |
42.685.704 |
10 |
ATK |
9.813.400 |
11 |
Peralatan Kantor |
45.420.500 |
12 |
Penggalangan Dana |
58.782.849 |
13 |
Pembuatan Gambar |
11.600.000 |
14 |
Mesin dan Komputer |
10.233.000 |
15 |
Acara Ground Breaking |
181.248.585 |
16 |
Lain-Lain |
28.823.900 |
17 |
Piutang |
153.500.000 |
18 |
Pembelian Lahan Tanah |
20.500.000 |
|
TOTAL PENGELUARAN |
4.489.100.607 |
SALDO SAMPAI 15 November 2015 adalah sebesar
Rp 176.157.792
Tidak ada komentar:
Write komentar