Laporan Keuangan Pembangunan Masjid An-Nubuwwah per 30 September 2015, sebagai berikut :
PENERIMAAN MAL INFAQ
NO |
KETERANGAN |
TOTAL (Rp) |
1 |
LAMPUNG |
880.198.267 |
2 |
JABODETABEK |
247.244.000 |
3 |
JAWA BARAT |
286.400.500 |
4 |
JAWA TENGAH UTARA |
130.000.000 |
5 |
JAWA TENGAH SELATAN |
283.905.000 |
6 |
SUMATERA SELATAN |
44.304.500 |
7 |
SUMATERA UTARA & NAD |
500.000 |
8 |
JAMBI |
76.635.000 |
9 |
KALIMANTAN BARAT |
130.250.000 |
10 |
KALIMANTAN TIMUR |
93.100.000 |
11 |
INDONESIA TIMUR |
1.706.000 |
12 |
MALAYSIA |
71.257.925 |
13 |
Markaz I CILEUNGSI |
91.816.575 |
14 |
THAILAND |
5.325.000 |
15 |
Donatur Dari ketua MPR |
37.618.000 |
16 |
Donatur Dari Kantor Kecamatan Natar |
14.248.300 |
17 |
Pendengar Rasil AM 720 |
22.7071.600 |
18 |
Hamba Allah (setor tunai) |
491.109.120 |
19 |
Hamba Allah (transfer Bank) s/d 30 September |
1.077.080.500 |
|
TOTAL PEMASUKAN |
4.189.970.287 |
PENGGUNAAN MAL
NO |
PENGELUARAN |
JUMLAH (Rp) |
1 |
Pembelanjaan Material |
2.702.244.669 |
2 |
Transportasi |
121.034.800 |
3 |
Jasa |
35.282.200 |
4 |
Upah Kerja Tukang |
321.375.000 |
5 |
Bisaroh Staff Kantor |
128.524.150 |
6 |
Konsumsi |
67.497.200 |
7 |
Akomodasi |
40.093.050 |
8 |
Percetakan |
17.902.000 |
9 |
Listrik, Air, Telephone |
34.014.077 |
10 |
ATK |
7.565.800 |
11 |
Peralatan Kantor |
52.570.000 |
12 |
Penggalangan Dana |
54.857.449 |
13 |
Acara Ground Breaking |
181.248.585 |
14 |
Lain-Lain |
9.278.000 |
15 |
Piutang |
158.000.000 |
16 |
Pembelian Lahan Tanah |
20.000.000 |
|
TOTAL PENGELUARAN |
3.951.486.980 |
SALDO SAMPAI 30 September 2015 adalah sebesar
Rp 238.483.307
Tidak ada komentar:
Write komentar