Laporan Keuangan Pembangunan Masjid An-Nubuwwah per 23 Agustus 2015, sebagai berikut:
PENERIMAAN MAL INFAQ
NO |
KETERANGAN |
TOTAL (Rp) |
1 |
LAMPUNG |
786.404.817 |
2 |
JABODETABEK |
229.744.000 |
3 |
JAWA BARAT |
250.445.500 |
4 |
JAWA TENGAH UTARA |
142.000.000 |
5 |
JAWA TENGAH SELATAN |
217.705.000 |
6 |
SUMATERA SELATAN |
39.486.000 |
7 |
SUMATERA UTARA & NAD |
500.000 |
8 |
JAMBI |
71.700.000 |
9 |
KALIMANTAN BARAT |
130.000.000 |
10 |
KALIMANTAN TIMUR |
89.500.000 |
11 |
INDONESIA TIMUR |
1.706.000 |
12 |
MALAYSIA |
71.257.925 |
13 |
Markaz I CILEUNGSI |
91.816.575 |
14 |
THAILAND |
5.325.000 |
15 |
Donatur Dari ketua MPR |
37.618.000 |
16 |
Donatur Dari Kantor Kecamatan Natar |
12.430.000 |
17 |
Pendengar Rasil AM 720 |
224.721.600 |
18 |
Hamba Allah (setor tunai) |
402.266.120 |
19 |
Hamba Allah (transfer Bank) s/d 9 Agustus |
1.036.005.500 |
|
TOTAL PEMASUKAN |
Rp 3.840.632.037 |
PENGGUNAAN MAL
NO |
PENGELUARAN |
JUMLAH (Rp) |
1 |
Pembelanjaan Material |
2.100.785.469 |
2 |
Transportasi |
107.869.800 |
3 |
Biaya Jasa |
161.490.200 |
4 |
Upah Kerja Tukang |
251.980.000 |
5 |
Bisaroh Staff Kantor |
109.200.000 |
6 |
Konsumsi |
61.355.700 |
7 |
Akomodasi |
39.100.050 |
8 |
Percetakan |
16.222.000 |
9 |
Lain-Lain |
9.278.000 |
10 |
ATK |
6.924.800 |
11 |
Peralatan Kantor |
52.570.000 |
12 |
Penggalangan Dana |
49.750.449 |
13 |
Acara Ground Breaking |
181.248.585 |
14 |
Listrik, Air, Telephone |
29.225.802 |
15 |
Piutang |
150.000.000 |
16 |
Pembelian Lahan Tanah |
20.000.000 |
|
TOTAL PENGELUARAN |
3.347.000.855 |
SALDO SAMPAI 23 Agustus 2015 adalah sebesar
Rp 493.631.182
Tidak ada komentar:
Write komentar