Laporan Keuangan Pembangunan Masjid An-Nubuwwah per 30 April 2015, sebagai berikut:
PENERIMAAN MAL INFAQ
NO |
KETERANGAN |
TOTAL (Rp) |
1 |
LAMPUNG |
260.107.025,00 |
2 |
Markas II MUHAJIRUN |
252.957.510,00 |
3 |
JABODETABEK |
187.044.000,00 |
4 |
JAWA BARAT |
213.304.500,00 |
5 |
JAWA TENGAH UTARA |
100.000.000,00 |
6 |
JAWA TENGAH SELATAN |
124.895.000,00 |
7 |
SUMATERA SELATAN |
27.636.000,00 |
8 |
SUMATERA UTARA & NAD |
500.000,00 |
9 |
JAMBI |
61.700.000,00 |
10 |
KALIMANTAN BARAT |
93.750.000,00 |
11 |
KALIMANTAN TIMUR |
73.500.000,00 |
12 |
INDONESIA TIMUR |
1.706.000,00 |
13 |
MALAYSIA |
50.677.925,00 |
14 |
Markaz I CILEUNGSI |
78.366.575,00 |
15 |
THAILAND |
5.325.000,00 |
16 |
Donatur Dari ketua MPR |
37.618.000,00 |
17 |
Donatur Dari Kantor Kecamatan Natar |
12.171.000,00 |
18 |
Hamba Allah ( setor tunai ) |
187.368.820,00 |
19 |
Hamba Allah (transfer Bank) s/d 30 April |
675.145.500,00 |
|
TOTAL PEMASUKAN |
Rp 2.443.772.855,00 |
PENGGUNAAN MAL
NO |
PENGELUARAN |
JUMLAH (Rp) |
1 |
Pembelanjaan Material |
1.122.061.719,00 |
2 |
Transportasi |
75.040.200,00 |
3 |
Biaya Jasa |
196.603.200,00 |
4 |
Upah Kerja Tukang |
11.0440.000,00 |
5 |
Bisaroh Staff Kantor |
40.400.000,00 |
6 |
Konsumsi |
31.460.200,00 |
7 |
Akomodasi |
24.897.700,00 |
8 |
Percetakan |
4.372.000,00 |
9 |
Lain-Lain |
9.278.000,00 |
10 |
ATK |
6.144.000,00 |
11 |
Peralatan Kantor |
43.499.000,00 |
12 |
Penggalangan Dana |
42.501.449,00 |
13 |
Acara Ground Breaking |
181.248.585,00 |
14 |
Listrik, Air, Telephone |
16.350.764,00 |
|
TOTAL PENGELUARAN |
1.904.296.817,00 |
SALDO SAMPAI 30 April 2015 adalah sebesar
Rp 539.476.038,00
Tidak ada komentar:
Write komentar