Laporan Keuangan Pembangunan Masjid An-Nubuwwah per 15 November 2015, sebagai berikut :
PENERIMAAN MAL INFAQ
| NO | 
KETERANGAN | 
TOTAL (Rp) | 
| 1 | 
LAMPUNG | 
978.104.817 | 
| 2 | 
JABODETABEK | 
274.044.000 | 
| 3 | 
JAWA BARAT | 
309.650.500 | 
| 4 | 
JAWA TENGAH UTARA | 
140.000.000 | 
| 5 | 
JAWA TENGAH SELATAN | 
339.755.000 | 
| 6 | 
SUMATERA SELATAN | 
49.304.500 | 
| 7 | 
SUMATERA UTARA & NAD | 
500.000 | 
| 8 | 
JAMBI | 
82.825.000 | 
| 9 | 
KALIMANTAN BARAT | 
155.250.000 | 
| 10 | 
KALIMANTAN TIMUR | 
109.100.000 | 
| 11 | 
INDONESIA TIMUR | 
9.951.000 | 
| 12 | 
MALAYSIA | 
99.792.925 | 
| 13 | 
Markaz I CILEUNGSI | 
98.316.575 | 
| 14 | 
THAILAND | 
5.325.000 | 
| 15 | 
Donatur Dari ketua MPR | 
37.618.000 | 
| 16 | 
Donatur Dari Kantor Kecamatan Natar | 
14.248.300 | 
| 17 | 
Pendengar Rasil AM 720 | 
186.500.000 | 
| 18 | 
Hamba Allah (setor tunai) | 
288.396.782 | 
| 19 | 
Hamba Allah (transfer Bank) s/d 15 Nov 2015 | 
1.436.576.000 | 
 | 
TOTAL PEMASUKAN | 
4.665.258.399 | 
PENGGUNAAN MAL
| NO | 
PENGELUARAN | 
JUMLAH (Rp) | 
| 1 | 
Pembelanjaan Material | 
3.079.179.969 | 
| 2 | 
Transportasi | 
131.643.200 | 
| 3 | 
Jasa | 
26.848.200 | 
| 4 | 
Upah Kerja Tukang | 
406.040.000 | 
| 5 | 
Bisaroh Staff Kantor | 
164.199.150 | 
| 6 | 
Konsumsi | 
78.069.700 | 
| 7 | 
Akomodasi | 
25.207.450 | 
| 8 | 
Percetakan | 
11.095.000 | 
| 9 | 
Listrik, Air, Telephone | 
42.685.704 | 
| 10 | 
ATK | 
9.813.400 | 
| 11 | 
Peralatan Kantor | 
45.420.500 | 
| 12 | 
Penggalangan Dana | 
58.782.849 | 
| 13 | 
Pembuatan Gambar | 
11.600.000 | 
| 14 | 
Mesin dan Komputer | 
10.233.000 | 
| 15 | 
Acara Ground Breaking | 
181.248.585 | 
| 16 | 
Lain-Lain | 
28.823.900 | 
| 17 | 
Piutang | 
153.500.000 | 
| 18 | 
Pembelian Lahan Tanah | 
20.500.000 | 
 | 
TOTAL PENGELUARAN | 
4.489.100.607 | 
SALDO SAMPAI 15 November 2015 adalah sebesar 
Rp 176.157.792
 
Tidak ada komentar:
Write komentar