Laporan Keuangan Pembangunan Masjid An-Nubuwwah per 30 September 2015, sebagai berikut :
PENERIMAAN MAL INFAQ
| NO | 
KETERANGAN | 
TOTAL (Rp) | 
| 1 | 
LAMPUNG | 
880.198.267 | 
| 2 | 
JABODETABEK | 
247.244.000 | 
| 3 | 
JAWA BARAT | 
286.400.500 | 
| 4 | 
JAWA TENGAH UTARA | 
130.000.000 | 
| 5 | 
JAWA TENGAH SELATAN | 
283.905.000 | 
| 6 | 
SUMATERA SELATAN | 
44.304.500 | 
| 7 | 
SUMATERA UTARA & NAD | 
500.000 | 
| 8 | 
JAMBI | 
76.635.000 | 
| 9 | 
KALIMANTAN BARAT | 
130.250.000 | 
| 10 | 
KALIMANTAN TIMUR | 
93.100.000 | 
| 11 | 
INDONESIA TIMUR | 
1.706.000 | 
| 12 | 
MALAYSIA | 
71.257.925 | 
| 13 | 
Markaz I CILEUNGSI | 
91.816.575 | 
| 14 | 
THAILAND | 
5.325.000 | 
| 15 | 
Donatur Dari ketua MPR | 
37.618.000 | 
| 16 | 
Donatur Dari Kantor Kecamatan Natar | 
14.248.300 | 
| 17 | 
Pendengar Rasil AM 720 | 
22.7071.600 | 
| 18 | 
Hamba Allah (setor tunai) | 
491.109.120 | 
| 19 | 
Hamba Allah (transfer Bank) s/d 30 September | 
1.077.080.500 | 
 | 
TOTAL PEMASUKAN | 
4.189.970.287 | 
PENGGUNAAN MAL
| NO | 
PENGELUARAN | 
JUMLAH (Rp) | 
| 1 | 
Pembelanjaan Material | 
2.702.244.669 | 
| 2 | 
Transportasi | 
121.034.800 | 
| 3 | 
Jasa | 
35.282.200 | 
| 4 | 
Upah Kerja Tukang | 
321.375.000 | 
| 5 | 
Bisaroh Staff Kantor | 
128.524.150 | 
| 6 | 
Konsumsi | 
67.497.200 | 
| 7 | 
Akomodasi | 
40.093.050 | 
| 8 | 
Percetakan | 
17.902.000 | 
| 9 | 
Listrik, Air, Telephone | 
34.014.077 | 
| 10 | 
ATK | 
7.565.800 | 
| 11 | 
Peralatan Kantor | 
52.570.000 | 
| 12 | 
Penggalangan Dana | 
54.857.449 | 
| 13 | 
Acara Ground Breaking | 
181.248.585 | 
| 14 | 
Lain-Lain | 
9.278.000 | 
| 15 | 
Piutang | 
158.000.000 | 
| 16 | 
Pembelian Lahan Tanah | 
20.000.000 | 
 | 
TOTAL PENGELUARAN | 
3.951.486.980 | 
SALDO SAMPAI 30 September 2015 adalah sebesar 
Rp 238.483.307
 
Tidak ada komentar:
Write komentar